The Company
Aqua Libre Entwicklungs GmbH was founded in 2005 of two wind energy companies - Energiewerkstatt und Windkraft Simonsfeld - together with the industrial designer Fritz Mondl who is the inventor and holder of the patent of the Strom-Boje®.
The main objective was and still is to achieve series-production readiness and the positioning on the international electricity market where renewable energy technology becomes more important.
The first prototype of the Strom-Boje® produced by Bilek+Schüll was installed in the river Danube in December 2006. The first testing was to achieve information on how the Strom-Boje® is influenced by the river in the course of one year, including low flow and high water, heat and coldness, high or low flow speed, floating refuse such as grass, branches up to whole trees and how swimmers, fishermen, boats and ships react on the Strom-Boje®.
This testing phase required more than 18 months. Several improvements had been made on the anchorage and the self-cleaning grate. We gained experience in mounting, maintenance, transport and enhanced the power engine.
By the end of 2008 the shares of Energiewerkstatt and Windkraft Simonsfeld were taken over by BILEK+SCHÜLL and BEB. An important step for Aqua Libre as now technical Know-How for the production is within the company.
At the same time a great fund was granted by the FFG which enables us to continue to work hard on achieving series-production readiness.
Our experience with the first proto-type had been considered in the second phase with small-scale tests where we concentrated on optimizing the performance. We spent one year on working on new rotors in different flow channels.
At our present level of proficiency and after further testing in nature and improvements in production we will be able in one or two years to offer our customers a high quality and high capacity hydro power plant.